Home / Support & Downloads / Invisible versus in-ceiling: build stage, not sound

Invisible versus in-ceiling: build stage, not sound

In short: Same acoustic goal; the difference is build stage and finish. Invisible is plastered in and hard to change; in-ceiling stays serviceable.

Different build stage

Invisible speakers are installed, skimmed and sanded with the wall, so they belong to the fit-out phase. In-ceiling speakers cut in and can be added later.

Different serviceability

Ceiling bezels come off and drivers can be replaced; plastered speakers require re-finishing.

Comparison

ItemInvisibleIn-ceiling
Build stageBefore skimAny time
LookNothing visibleVisible bezel
Aperture85 / 105 / 185 mmSame
ServiceRe-finish neededBezel removable

Cost: once plastered, changes are expensive - decide before the skim.